Garden Reach Shipbuilders and Engineers Ltd (GRSE) handed over the stealth frigate Vindhyagiri (Yard 3024) to the Indian Navy on 27 November 2026 at its shipyard in Kolkata, West Bengal. According to the Ministry of Defence release issued through the Press Information Bureau, Vindhyagiri is the seventh and final ship of the Nilgiri class, also known as Project 17A, and its delivery completes the entire seven-ship programme.

The ship is the third Project 17A frigate built by GRSE, the ministry said. PSU Watch reported that Rear Admiral R.S. Dhaliwal of Headquarters Eastern Naval Command formally accepted the vessel on the Navy's behalf.

What does the delivery of Vindhyagiri complete?

It completes the delivery of all seven Project 17A frigates to the Navy within 23 months, counted from the handover of the lead ship, INS Nilgiri, on 20 December 2024, the ministry said. The defence ministry described the milestone as a major step towards self-reliance in warship design and construction.

The ministry also said the experience gained from building the six earlier ships helped shorten Vindhyagiri's construction period to 68 months, compared with 84 months for INS Nilgiri. In a Hindi version of the same release, the delivery year is printed as 2023, but the English release and the posting date both place the handover on 27 November 2026, and news reports dated the same day confirm it.

What kind of warship is it?

Project 17A frigates are multi-mission warships designed by the Navy's Warship Design Bureau and built under the supervision of the Warship Overseeing Team in Kolkata, the ministry said. Compared with the earlier Project 17 (Shivalik) class, they carry a more advanced suite of weapons and sensors for anti-surface, anti-air and anti-submarine warfare.

  • Propulsion: a Combined Diesel or Gas (CODOG) plant, with a diesel engine and a gas turbine driving a controllable pitch propeller on each shaft.
  • Control: an Integrated Platform Management System to monitor and run the ship's systems.
  • Size: PSU Watch reported the frigate is 149 metres long, displaces 6,670 tonnes and has a complement of 225 personnel.

Why the name Vindhyagiri?

The ship is named after the Vindhyagiri hill range in Karnataka and revives the name of an earlier INS Vindhyagiri, a Leander-class frigate that served the Navy from 8 July 1981 to 11 June 2012, the ministry said. The new Vindhyagiri was launched on 17 August 2023 by President Droupadi Murmu, according to PSU Watch.

Why it matters for Indian shipbuilding

According to the ministry, the Project 17A programme has 75 per cent indigenous content, drew in more than 200 micro, small and medium enterprises, and generated direct employment for about 4,000 people and indirect employment for more than 10,000. For GRSE, a defence public sector shipyard, Vindhyagiri is its 811th delivered vessel and 121st warship, PSU Watch reported. Greater Kashmir, reporting from New Delhi, also confirmed the delivery and the 23-month timeline.

What happens next?

The delivery marks the Navy's acceptance of the ship from the builder; the formal commissioning of the frigate into the fleet will follow at a later ceremony. The defence ministry has not announced a commissioning date for Vindhyagiri in its release, and no official timeline had been published at the time of writing.

Photo source