Travellers flying from London Heathrow Airport this weekend will have no Heathrow Express or Elizabeth line trains to the airport on Saturday 28 and Sunday 29 November 2026. No trains will run in or out of London Paddington station because Network Rail is rebuilding Dolphin Junction near Slough in Berkshire. The London Underground's Piccadilly line will be the only rail link between central London and Heathrow.
National Rail Enquiries' travel advice for the closure says no Elizabeth line or Heathrow Express trains will run to or from Heathrow Airport on either day. Great Western Railway (GWR) trains also cannot use Paddington.
Which trains are affected this weekend?
All rail services into London Paddington are affected, including both fast links to Heathrow. National Rail says Elizabeth line trains will run only between Maidenhead and Reading. There will be no Elizabeth line service between Maidenhead and Abbey Wood, or between Heathrow Airport and Shenfield. A travel report by Travelling for Business said this means no Elizabeth line trains at central London stations such as Bond Street, Tottenham Court Road, Farringdon, Liverpool Street and Canary Wharf.
Long-distance GWR trains to and from Bristol and South Wales will be diverted via Swindon to London Euston, so journeys will take longer. Most other long-distance GWR services will start and end at Reading. Replacement buses will run between Ealing Broadway and Slough, and between Slough and Maidenhead.
How can passengers reach Heathrow?
The Piccadilly line is the only train service between central London and Heathrow this weekend, National Rail said. It is slower than Heathrow Express, so air passengers should leave extra time. Travelling for Business also listed coaches, buses, taxis and private hire cars as options, and reminded drivers that Heathrow charges for drop-offs.
For travel to the Thames Valley, National Rail suggests Chiltern Railways from London Marylebone to High Wycombe, Oxford or Banbury. It also mentions a special fast GWR service between Reading and Guildford that connects with South Western Railway trains to London Waterloo. It warned that direct trains from Reading and Windsor & Eton Riverside to Waterloo are expected to be very busy because of rugby at Twickenham.
Why is the line closed?
Network Rail is spending £27.8 million to renew and improve the eastern side of Dolphin Junction, between Slough and Langley stations. According to Network Rail's project page, the work includes a new track layout, new overhead electrification equipment with nine new structures and about one kilometre of new wire, new points equipment, two moved signals and new lineside signalling cabinets.
The junction carries more than 400 trains and 100,000 passengers every day, plus about 123 million tonnes of freight a year, Network Rail says. The aim is to make journeys through the Thames Valley into London more reliable. The work follows an upgrade of the western side of the junction at Christmas 2025.
Why does it matter for travellers?
Heathrow is a major hub for long-haul travel, including flights to and from India. Passengers landing or departing this weekend who usually rely on Heathrow Express or the Elizabeth line will need to change their plans. The closure also comes straight after a 24-hour strike by Rail, Maritime and Transport (RMT) union Tube drivers. That strike ran from midday on Thursday 26 November to 11:59 on Friday 27 November and stopped the Piccadilly line all day.
What happens next?
Normal services are expected to return on Monday 30 November if the work finishes on time, according to Travelling for Business. Passengers flying that day should check that trains are running before they set off. Network Rail has planned a longer closure from 27 December 2026 to 3 January 2027 to complete more of the work. Travelling for Business also reported that the RMT has called further 24-hour Tube strikes from midday on 17 December and 19 December.
Photo source · Andrewrabbott, CC BY-SA 3.0




