Additional Chief Secretary for Urban Development and Housing Sanjay Dubey inspected major Simhastha Mahaparv 2028 infrastructure sites in Ujjain on November 28, focusing on works scheduled for completion by December 2026 and pressing contractors over construction quality and monsoon drainage readiness.
Road Widening, Drainage and Traffic Rotaries
Starting from the four-lane widening project between Nanakheda Square and Shanti Palace, Dubey questioned contractors after spotting deficiencies, instructed officials to cover roadside chambers with high-grade steel, and directed a GIS survey for planting large shade-giving trees alongside coordinated single-agency junction design.
At Do Talab–Tagore Square, he ordered careful calibration of road slab height to avert waterlogging, while at Hariphatak and Nandi Square beneath the bridge he asked engineers to design an all-direction traffic rotary. Inspecting Road No 3 and Road No 10 via Badnagar Road, Dubey stressed completing drainage and utility pipelines prior to surfacing because of black soil moisture.
Temple Expansion and Command Centre Oversight
Dubey also reviewed Circuit House pillar finishing near Bhukhi Mata, Kartik Mela Ground–Naikhedi Simhastha bypass progress, Mangalnath Temple spire expansion, and the Simhastha Mela Office, emphasising high-resolution surveillance cameras and integrated electrical-drainage layouts at the proposed Integrated Control and Command Centre.
Divisional Commissioner and Simhastha Fair Officer Asheesh Singh, Collector Raushan Kumar Singh, and Municipal Commissioner Abhilash Mishra accompanied him during the field tour.




