BHOPAL / NARMADAPURAM: Farmers across central Madhya Pradesh are set for relief in moving heavy agricultural machinery after West Central Railway (WCR) emphasised higher clearance standards of at least 5.5 metres for new railway underpasses, replacing older 3.5-to-4-metre structures that routinely blocked tractors and combine harvesters.

Upgraded Vertical Clearance and Dual-Lane Width

The issue was pressed in recent WCR review meetings by Hoshangabad Member of Parliament Darshan Singh Choudhary, who pointed out that low box underpasses force harvesters and loaded farm trolleys to make lengthy detours or risk structural damage. Under updated specifications, single- and dual-lane underpasses are planned with vertical clearance of 5.5 metres or more and widths ranging between 10 and 12 metres for two-lane corridors.

WCR Chief Public Relations Officer Dr Madhur Sharma noted that adequate height and width, alongside engineered slopes and larger culverts, are essential to prevent seasonal waterlogging inside underpasses during monsoon harvests.

Farm Track Access and Urban Underpass Works

Alongside rural agricultural crossings around Narmadapuram and Jabalpur divisions, representatives pushed for alternate connecting farm tracks and four-times land compensation where agricultural plots are affected. In state capital Bhopal, widening works on the Aishbagh railway underpass are also progressing to ease bottlenecks for daily commuters.

Source 1 · Source 2