Madhya Pradesh Chief Minister Mohan Yadav on 27 November 2026 inaugurated both phases of the Seep-Ambar Micro Irrigation Project at Bhairunda in Sehore district, a ₹536.23 crore scheme that carries Narmada river water through underground pipelines to farmland in 76 villages. Union Agriculture and Rural Development Minister Shivraj Singh Chouhan joined the event virtually rather than in person, Amar Ujala and Asianet News Hindi reported.

What does the Seep-Ambar project cover?

The project is meant to bring 30,091 hectares of farmland in the Bhairunda block under irrigation, according to the reports. It was built in two phases. The first, costing ₹346.12 crore, uses a 16.57 km pipeline to serve 15,284 hectares in 47 villages. The second, costing ₹190.11 crore, lays 24.09 km of pipeline for 14,807 hectares in 29 villages. Amar Ujala named M/s Vijay Kumar Mishra Construction Pvt Ltd of Rewa and LCC Projects Ltd of Ahmedabad as the contractors for the two phases. Asianet News Hindi said more than 8,000 farmers are expected to benefit.

Yadav started the project by pressing a remote button. He also inaugurated and laid foundation stones for other works in the area worth ₹41.44 crore, which Asianet News Hindi said included five roads, a rest house at Salkanpur, a government girls' higher secondary school and a laboratory, along with a community hall at Gopalpur and a cement concrete road at Bagwara. Water Resources Minister Tulsi Silawat and district in-charge minister Krishna Gaur were present.

What did the leaders say?

Yadav said that when dry fields receive water, the crop "becomes like gold", and described the scheme as Narmada water reaching farmers' fields. According to Kisan India, he said reliable water would let farmers grow more crops a year and reduce their irrigation costs.

He also attacked the Congress. Yadav claimed irrigated area in the state stood at about 7.5 lakh hectares under Congress rule, rose to around 40 lakh hectares under earlier BJP governments, and has crossed 60 lakh hectares in his government's two and a half years. These figures are his claims and were not independently verified. He also said farmers now get electricity during the day.

Speaking virtually, Chouhan said the Centre and the state were working in farmers' interests and that the project would raise water availability for more than 30,000 hectares across 76 villages, Kisan India reported.

Why the joint event drew attention

Ahead of the inauguration, the Free Press Journal had reported that Yadav and Chouhan were expected to share a stage at Bhairunda, in what it called their first joint public appearance in a long time. The paper linked earlier friction between the two leaders to the removal of temporary structures built by tribal residents on forest land in Budhni, and said senior BJP leaders had since eased tensions. In the event, Chouhan took part online.

What next?

With both phases now commissioned, the test will be whether water reaches the planned 30,091 hectares through the pipeline network. Irrigation remains a live issue elsewhere in the state, where projects in the Wainganga basin are under review.

Photo source · Yann, CC BY-SA 4.0