Commuters in south Bengaluru got their first rides on Namma Metro's Pink Line on Saturday, 14 November 2026, when commercial services began at 6 am on the 7.5-km elevated stretch between Kalena Agrahara and Suddagunte Palya (Tavarekere). Prime Minister Narendra Modi formally inaugurated the section a day earlier, on Friday.
The opening pushes Bengaluru's operational metro network past the 100-km mark for the first time, to roughly 103 km, according to figures shared by Karnataka minister Krishna Byre Gowda ahead of the launch.
A rose and a 6 am start
Gowda, who handles Bengaluru development, reached Kalena Agrahara station early in the morning, handed pink roses to the first passengers and rode with them to the other end of the line, according to an IANS report. "On the dot at 6 a.m., the Pink Line services have commenced," he told reporters. He described the first group of riders as an enthusiastic group of women dressed in pink.
Passengers quoted by Public TV said the line had been a long time coming and that they were tired of the traffic on the corridor. Commuters told IANS that a trip between these points that takes 20 to 30 minutes by road now takes around nine to ten minutes by metro. Residents had waited more than three years for operations to begin, the agency noted.
Six stations and a Yellow Line link
The newly opened section has six elevated stations:
- Kalena Agrahara
- Hulimavu
- IIM Bangalore
- JP Nagar 4th Phase
- Jayadeva Hospital
- Suddagunte Palya (Tavarekere)
Jayadeva Hospital station offers an interchange with the Yellow Line, which serves the Electronic City corridor. Speaking before the launch, Gowda had argued that the connection matters: "If this were only a 7.5-kilometre standalone line, perhaps it would not be as effective," he said, as reported by PTI.
Timings and frequency
According to the schedule reported by Public TV and IANS, the first trains run at 6 am from both ends from Tuesday to Saturday, at 7 am on Sundays and at 4.55 am (Kalena Agrahara) and 5 am (Suddagunte Palya) on Mondays. The last trains leave Kalena Agrahara at 10.50 pm and Suddagunte Palya at 10.54 pm.
On weekdays, trains run every eight minutes during peak hours and every ten minutes at other times; on weekends, the interval is ten minutes through the day. Bangalore Metro Rail Corporation Limited (BMRCL) has said the frequency may be revised depending on passenger demand, Public TV reported. Barricades have also been installed at all Pink Line stations, and passengers are required to stand behind them.
Feeder buses from day one
The Bengaluru Metropolitan Transport Corporation (BMTC) is running 28 buses on five new feeder routes, making 401 trips a day, to link the Jayadeva Hospital, JP Nagar, Hulimavu and Tavarekere stations with areas such as Uttarahalli, Singasandra, Bilekahalli and Begur, Public TV reported. Tickets for both bus and metro can be bought through the Namma BMTC 2.0 app and the National Common Mobility Card.
Why it matters and what comes next
The stretch is only the first part of the Pink Line. The full corridor, about 21 km long, will run from Kalena Agrahara in the south to Nagawara in the north, with the rest of the route built underground. "We will keep up our efforts to operationalise Pink Line up to MG Road and then Nagawara," Gowda said on Saturday.
Before the launch, the minister had said the state is aiming to take the network past 170 km within 18 months, a period in which the underground Pink Line section and the Blue Line towards the airport are also expected to progress. He also called for greater support from the Centre, saying: "Just pointing a finger at the state government and stopping there is not enough. The Centre also has to help."
For daily commuters in south Bengaluru, the immediate test will be whether frequency and last-mile feeder links hold up as ridership grows on a corridor long choked by road traffic.




